• Sign in |
  • Join Free |
  • Post Offer Free |
  •  Inquiry Basket |
  • Site Map |
  • China Map
  • Gold Index:123
    Company Info

    Beijing Aoyu Formwork Co., Ltd.
    [China (Mainland)]

    Online Postings:. Products [0] Trade Leads [11]
    Business Type:
    City: beijing
    Province/State: Beijing
    Country/Region : China (Mainland)


    View Contact Details
    You are here:home  > trade  > Shoring System For The Early-Strip Formwork
    Beijing Aoyu Formwork Co., Ltd.

    Shoring System For The Early-Strip Formwork

    Subject:Shoring System For The Early-Strip Formwork
    Update Date:2007-01-29 00:00:00.0
    Valid Period: Never expired
    Contact Info  
    Tel:86-010-61271117-60411
    Fax:86-010-51184666
    Contact Person:
    Job Title:sles manager
    Mobile Phone:0086 13915175500

    or
     Description
    1. Adopting the expanded composite steel frame or rimless high-strength membrane bamboo plywood 55 with uneven thickness and both steel formwork and small steel formwork are adopted to attain the effects of dry concrete to cut down the quantity of plastering works and material;

    2. Composite manifold early-strip column head applies to early-stripping of floor in varied structures, including early-stripping of the formwork; It also constitutes adjustable bracket, adjustable base, and adjustable crossbar;

    3. Replacement of three sets of formworks and shoring with one set of formwork and two sets of support can greatly cut down the amount of formwork and support, speed up their circulation and advance the efficiency of the formwork;

    4. The connection between the crossbars is realized through fasteners on crossbars of the wedge caulking self-lock manifold scaffold and cups on the column in oblique direction, coupled with the cap, making itself secure, good at directing property in support, adjustable shoring height dependent on the height of the floor and easy to operate;

    5. Abundant practices are available such as shared support by beam and slab, shared support by beam, slab and column and early-strip formwork shoring suitable for 3-4 days per floor and 5-6 days per floor;

    6. Rational design of assembling the formwork enables a doubled construction progress, improved quality, lower formwork costs and less labor intensity.
    Didn't find what you're looking for ?
    Post a Buying Lead or contact our customer service specialist for help!